Projects

Schwada ClassroomSchwada Classroom

Schwada Classroom

  • System Size (kWp rating): 92.12 kW
  • Offtaker: Arizona State University
  • Location: 650 E Orange St, Tempe, AZ 85281
  • Commercial Operation Date: 04/01/11
  • Electrical/Solar Install: Roof Mount
Sandra Day O’Connor Historical MuseumSandra Day O’Connor Historical Museum

Sandra Day O’Connor Historical Museum

  • Location: 1230 N. College, Tempe
  • Commercial Operation Date: 12/31/2009
  • Commercial Electrical
Verrado Fire House No. 3Verrado Fire House No. 3

Verrado Fire House No. 3

  • Location: 2582 N. Verrado Way, Buckeye, AZ
  • Commercial Operation Date: 5/31/2012
  • Commercial Electrical

Phoenix Veterans Affairs HospitalPhoenix Veterans Affairs Hospital

Phoenix Veterans Affairs Hospital

  • System Size (kWp rating): 4.45MW
  • Location: 650 E. Indian School Rd, Phoenix, AZ
  • Commercial Operation Date: 8/1/2012
  • Electrical/Solar Install: Parking Structure
Yuma County Airport AuthorityYuma County Airport Authority

Yuma County Airport Authority

  • System Size (kWp rating): 550.6 kW
  • Location: 2191 E 32nd St, Yuma, AZ
  • Commercial Operation Date: 12/16/2010
  • System Sponsor, Developer, EPC, O&M: Steel Parking Structure
Ruan Transportation Management CenterRuan Transportation Management Center

Ruan Transportation Management Center

  • Location: 4880 W. Watkins, Phoenix, AZ
  • Commercial Operation Date: 10/15/2009
  • Commercial Electrical

Solar CellsSolar Cells

Solar Cells

Wind TurbinesWind Turbines

Wind Turbines

Phoenix City HallPhoenix City Hall

Phoenix City Hall


Laguna del MarLaguna del Mar

Laguna del Mar

Indianapolis Motor SpeedwayIndianapolis Motor Speedway

Indianapolis Motor Speedway

  • System Size (kWp rating): 10 MW
  • Offtaker: Indianapolis Motor Speedway Corporation
  • Location: 4790 W. 16th St., Indianapolis, IN 46222
  • Commercial Operation Date: TBA
  • Electrical/Solar Install: Ground Mount
South Ridge Solar FarmSouth Ridge Solar Farm

South Ridge Solar Farm

  • System Size (kWp rating): 2.2MW
  • Offtaker: Middle Road Ventures, LLC
  • Location: Middlebury, Vermont
  • Commercial Operation Date: TBA
  • Electrical/Solar Install: Ground Mount

Page 2 of 2 12